Slope erosion Control project: Via San Mateo

igm1
baner-dosel-eng-1
  • Start date: December 19, 2016
  • Completion date: December 21, 2016
  • Work: Slopes erosion control of San Mateo road, using GMAT-R560
  • Contractor: Spondylus Consortium
  • Extension: 65.000,00 m2
  • Product: GMAT-R560
  • Conclusions:
  • To have an optimal performance requires greater production of anchors.
  • A stock of anchors of different lengths is required.
  • It requires more personnel to anchor the erosion control mats in reference to the established area.
  • In slopes, where the material looks harder, it is advisable to make T-type anchors of about 15 cm. of length (making tests) since we tested with U-type anchors and it is difficult to place them.